W 116 2GKB - Installation wall >22 cm. Double rack structure with two-layer cladding

All Dry construction calculators
Toplivo AD
National telephone of Toplivo AD

Calculator W 116 2GKB - Installation wall >22 cm. Double rack structure with two-layer cladding

To make a calculation:
1. Enter the desired quadrature.
2. Select the desired products.

Area(sq.m.):
Product Price
(per unit)
Cons. rate
(per sq.m.)
Price
(per sq.m.)
Materials
(per sq.m.)
Price
(per sq.m.)
Metal profile CW
3.6 l.m.
Metal profile UW
1.6 l.m.
Sealing tape
1.6 l.m.
Nail dowel
3.6 pc.
Gypsum board GKB 12,5 мм.
2.1 sq.m.
Gypsum board GKI/GKF 12,5 мм
2 sq.m.
Screw 3,5х25
18 pc.
Screw 3,5х35
30 pc.
Putty
0.2 kg.
Joint filler
0.8 kg.
Glass fibre tape
2 l.m.
Total price:
Save or Print Save / Print

The resulting quantities are only tentative as they do not provision for losses and cut-outs!
There may be possible deviations from the estimates due to various conditions.
All prices are quoted gross of VAT.